西江(界首至肇庆)航道扩能升级工程(XJ6合同段)
Xijiang (Jieshou-Zhaoqing) Waterway Expansion Project (XJ6 Contract Section)
本项目起于南宁(民生码头),止于贵港航运枢纽,全长270余公里。南宁(民生码头)至南宁港中心港区(南宁五合大桥下游约250米)段约45公里,按内河Ⅲ级航道标准建设;南宁港中心港区至贵港航运枢纽段约230公里,按内河Ⅱ级航道标准建设。
工程介绍Reef blasting works
项目主要对豹子头至柳沙娘、良庆至三升米洲、湴滩、鸡儿滩、地伏滩、噙唠滩、伏波大滩等滩段进行整治,以及对库区航道的零星碍航礁石进行清除。主要建设内容为疏浚、水下炸礁、清障、筑坝、航标、水土保持、环保及相关配套工程。
 
The project mainly rehabilitates beach sections from leopard head to Liu Sha Niang, LiangQing to San Sheng Mizhou, Qiongtan, Jiertan, Veda Beach, Qiongla Beach and Fubo Beach, as well as sporadic obstacles to waterway in the reservoir area Voyage reefs cleared. The main construction contents include dredging, underwater reef, obstacle clearance, dam construction, navigation mark, soil and water conservation, environmental protection and related supporting projects.
 