工程介绍Reef blasting works
为保证华能东方电厂煤船进出安全,对码头港池及航道回淤进行维护性疏浚,达到5万吨级标准船型通航条件。
满足港池及航道水域底高程-13.6m,宽度150m,码头前沿停泊水域底高程-13.8m(当地理论最低潮面)。疏浚工程总量约为144万立方米。
order to ensure the safety of Huaneng Dongfang Power Plant coal bunker, maintenance dredging of silos and silos of the port was completed, reaching the standard shipping conditions of 50,000 tons, meeting the bottom elevation of tank and fairway water -13.6m and width of 150m. Mooring water at the end of elevation -13.8m (the local theory of the tide surface). The total dredging project is about 1.44 million cubic meters.