Xinglong to Hanchuan section of the waterway construction standards for the Ⅲ (2) level, the renovation works include dam construction, beach belt engineering, bank protection works, dredging works, filling engineering, aids to navigation and ancillary facilities, the total length of nearly 200 kilometers.